FPSO TOPSIDE POWER MODULES

Martin Bencher transported two shipments of FPSO topside power modules. They were shipped via barge.

Batch #1: 2 x power modules - Total GW: 3,045 tons (approx. 1,500 tons each module) / 17,781.49 M3.

Batch #2: 2 x exhaust stacks + 2 x pipe spools  – Total GW: 511 tons (approx. 255 tons / 28 meters height for each stack) / 10,877.00 M3.
 

icon-linkedin.png
icon-fb.png
icon-youtube.png
fiata.png
Our company is credit worthy according to Bisnode's credit assessment system that is based on a number of decision rules. This credit rating is updated on a daily basis, and always shows the current rating and date.
GC_Endorser.png
BV-DK-Skabelon-_9001_2015-mgr-system
BV-DK-Skabelon_14001_2015-mgr-system
BV-DK-Skabelon_DS-18001-og-bek